Contact our Experts
Geothermal steam separation

Clean steam is the difference between rated output and repeat downtime.

Moisture carryover leads to silica scaling, pipe erosion and turbine blade fouling which reduce geothermal plant performance. Peerless separation technologies remove the moisture and solids at the source, reducing the risk of unexpected maintenance outages.

40+
years geothermal experience
30+
worldwide projects
99.9%
steam quality achieved

Geothermal separation products

Wellhead steam separators

Remove liquids and solids from geothermal steam at the source, maximizing steam dryness, minimizing pressure drop and reducing moisture carryover to protect plant piping from erosion and corrosion.

Also known as scrubbers, purifiers, vane mist eliminators, multi-cyclone scrubbers, gas/liquid separators, coalescers and process filtration systems.

Turbine inlet scrubbers

High-efficiency vane and cyclonic technologies protect turbine blades against particulate contamination, droplet impaction and mineral deposits which can cause imbalance and lead to unexpected shutdowns and expensive overhauls.

Vane separation technology

100% removal of droplets 8 microns and larger. Low pressure drop, compact footprint and no moving parts, proven in geothermal, fossil fuel and nuclear power plant steam applications.

Cyclone separation technology

Cyclone separators use swirl tube or multi-cyclone technology to remove liquid and/or solids from steam. These are adaptable to most steam systems in a compact vessel design.

Multi-stage internals

Proprietary separation internals can be mixed and matched to optimize separation performance. Effective inlet flow diffusion, bulk separation, aerosol separation, and the protection of separated liquids each impact overall performance.

Process and vessel engineering

Process design backed by performance warranties, CFD simulation and flow analysis, ASME mechanical vessel design and fabrication QA oversight.

Why steam quality matters

Performance overview

Steam quality directly affects plant performance and equipment life across the full facility, from turbine blades to heat exchangers to the piping between them.

Separation performance

  • 100% removal of liquid droplets 8 microns and larger
  • High-efficiency liquid slug removal
  • Stable performance during load changes and transients
  • Optimized pressure drop across all conditions

Operational impact

  • Reduced mineral deposits
  • Reduced erosion and corrosion of piping
  • Increased steam turbine efficiency
  • Extended operation between shutdowns
  • Improved turbine blade balance and heat exchanger efficiency
  • More megawatt power output
  • Less frequent maintenance shutdowns

Retrofit solutions for existing plants

Upgrade, don't replace
  • Increase plant power output and uptime
  • Avoid full vessel replacement
  • Reduce scaling, corrosion and erosion
  • Lower long-term maintenance costs

Modern retrofit internals improve moisture separation efficiency and extend equipment life.

Many upgrades install without welding, enabling fast turnaround and fewer inspections.
Contact our Retrofit Experts

Built for demanding geothermal conditions

Technical specification
Parameter Specification
Solids loading Rocks, silica and mineral solids
Pressure High-pressure. ASME vessel design
Temperature High-temperature geothermal service
Flow conditions Variable. Wet steam and multi-phase service
Engineering centers in the USA, China, Singapore, Dubai and Pune
Worldwide fabrication network with local content maximization where required
Startup and commissioning support from process design through operation

Geothermal Resources

Reference materials
Sales sheet

Clean steam & maximum power for geothermal applications

Peerless steam separation solutions for geothermal plants, with performance data and technical specs.

View PDF →
Article

Why steam quality drives geothermal plant performance

How moisture carryover negatively impacts systems across the plant, not just the steam turbine.

Read article →
Article

Vane vs. Cyclone Separation for Geothermal Steam: Which Technology Fits Your Application?

Compares vane and cyclone separation for geothermal steam, and when each technology fits based on solids, liquid loading, and pressure drop..

Read article →
Case study

Steam Separation for a 3 x 110MW Geothermal Plant in Indonesia

Peerless delivered CFD-optimized steam separators and vane purifiers achieving up to 99.9% steam dryness for a 3 x 110MW geothermal plant in North Sumatra.

Read case study→

Frequently asked questions

Common questions

Specification & engineering

Yes. Every separator internal is engineered to the specific reservoir's flow rate, pressure, temperature, moisture loading, and solids concentration rather than pulled from a standard catalog, because geothermal reservoirs vary significantly and change over the life of the field. Sizing is based on actual or projected wellhead conditions, not generic assumptions.

Every separator we design is backed by CFD study data. Our standard sizing program uses that data to confirm the required vane open area for your specific operating flow conditions, so CFD-informed design is built into the standard engineering process at no additional cost. For custom or retrofit projects, particularly where existing vessel geometry constrains the internals, we also offer project-specific CFD modeling and flow analysis as an optional add-on to further validate separation efficiency and pressure drop before fabrication. Whether that additional study is included or quoted separately depends on the complexity of the project.

It comes down to how the solids are behaving in the flow, along with your space and footprint constraints. If incoming solids are encapsulated within liquid droplets, a vane-type separator is typically the right fit. If there are free, suspended solids at the inlet nozzle, cyclonic internals are usually the better choice. Both technologies handle high liquid loading well. Vane separators tend to be favored where liquid loading is high, large slugs are expected, or a lower-cost, low-pressure-drop, high-turndown solution is needed in a smaller footprint, while cyclone (centrifugal) separation is favored where fine droplet removal at high efficiency is the priority.

Yes, we provide performance warranties, not just design targets. Terms are customized to the specific project's requirements and design conditions, with agreed-upon performance criteria defined on a project-by-project basis. We offer both overall performance guarantees and micron-level efficiency guarantees. For commercial steam drum applications, for example, we base performance guarantees on total dissolved solids (TDS, in ppm) in the boiler water, referencing ABMA boiler feedwater guidelines by operating pressure, and guarantee TDS levels at the outlet steam nozzle. On the micron side, we guarantee 100% removal of particles 8 to 10 microns and larger.

Retrofit-specific

Often, yes, but it depends on the scope of work. In many retrofit projects, existing supports and nozzles can be reused, which avoids triggering a full re-certification under NBIC rules. If the retrofit requires welding to the vessel shell or adding new nozzles, that work falls under repair and alteration codes and may require re-registration. A qualified engineer reviews the specific vessel and scope up front, so operators know which path they're on before work begins.

Retrofit internals are specifically designed to be installed during standard planned outages rather than requiring dedicated extended downtime. Because the goal is typically to reuse the existing vessel and avoid full replacement, the scope of field work, cleaning, access through the manway, and installing new internals, is planned to fit inside a normal maintenance outage window. Actual duration still depends on vessel size, access, and whether any welding is required.

We'll want to review all available drawings of the vessel to support our analysis. That review happens during the quote stage. If the existing vessel or nozzles aren't sufficient to handle the new operating flow conditions, we'll flag that up front before moving forward.

Protect the turbine so it never sees wet steam.

Send us your wellhead conditions and plant configuration. Our engineering team will size a separation solution for your operating conditions.

Or email our team directly at sales@onececo.com

Request a site review

Send us your wellhead conditions.

Share your operating conditions and plant configuration. A Peerless applications engineer will review the data and recommend a separation approach sized to your service.

  • Reviewed by an applications engineer, not a call center
  • Sizing based on your actual or projected wellhead conditions
  • Retrofit and new-build scopes both welcome

Prefer email? Write to sales@onececo.com.